For a metal building in Tucson, the choice is closed-cell spray foam under the roof or a sealed blanket system, and how you use the building decides which. We insulate steel buildings, shops, pole barns, warehouses and offices, and we work with builders on new construction. Ask for a free site visit and we'll give you a written quote.
How you use the building decides it, because that sets whether heat or dripping matters more to you. Steel heats up in the sun and cools off fast. When humid air touches cold metal, water forms and drips onto your stock, equipment and floor.
Spray foam bonds straight to the underside of the panels. That keeps moist air off the steel, so there's no cold surface to sweat. It also closes the air leaks at seams and fasteners. How we work around your operations is covered below. The downsides are on our spray foam insulation page.
A blanket system is fiberglass with a vinyl or foil facing, hung under the roof and along the walls. The facing is your moisture barrier. Every seam has to be taped and sealed, and any tear repaired. If the facing is punctured or the seams are open, moist air reaches the steel and the dripping comes back.

A pole barn gives you more choices than a steel building because the framing is wood and the girts give us something to fasten to. Pick by use: a workshop you work in, or a barn that only has to stay cooler for storage.
If the shop is the garage at your house, or a casita, go to garage insulation.
In a warehouse the roof is where the heat comes in, so we start there. That means spray foam under the deck or a blanket system, depending on the roof and what hangs from it. Walls come second. They're worth doing where people work or product has to stay cooler.
An office with a ceiling and open space above it is simpler. We can blow insulation in over the ceiling without disturbing the room below. See attic insulation for how that goes. Existing exterior walls can be filled without tearing out the drywall. See wall insulation.
Tell us your hours, your delivery and loading schedule, and what has to keep running. We settle the order of work, which areas get cleared and when we'll be in the building at the site visit, before you see the quote.
Foam work needs a cleared area, so stock and equipment are moved or covered first. We do the building in sections where we can, so one area stays in use while we work in another.
If you're gutting an older commercial building, check the county's asbestos rule before any tear-out: Pima County DEQ requires an application when a renovation will strip or remove 160 square feet of facility components, 260 linear feet of pipes, or 35 cubic feet of components that can't be measured by length or area.
That covers regulated buildings, not residential buildings with four or fewer units. Renovation covered by the federal asbestos rule has to be reported to the Pima County Department of Environmental Quality (PDEQ) and needs a PDEQ Asbestos NESHAP Activity Permit. Tell us the building's age and your renovation plans at the site visit, so the schedule leaves room for any filing.
We work with builders and general contractors on new construction, including steel buildings, shops and offices. Send us the plans and we'll price the insulation from them, in writing.
The timing is simple. Insulation goes in after framing and the electrical and plumbing rough-in, and before drywall closes the walls. On a steel building it can go on as the panels go up. Give us your schedule and we'll fit it.
Energy codes are set by each city, town or the county, so the insulation plan follows the code where the building is going up. Send us the address and the permit set and we'll match it. We check the permit rule for the address and pull the permit where one is needed. Your building permit stays yours.
Closed-cell spray foam on the underside of the roof and walls is the strongest choice where heat and condensation both matter. A taped, sealed, vinyl-faced blanket is the other solid choice for a simple building where the facing will stay intact. Spray foam is harder to remove later, so be sure of the choice before we spray.
On the site visit we look at how you use the building and pick one with you. The written quote that follows gives the exact price for your building, material and square footage included. What insulation costs and what spray foam costs explain what moves the price. For how materials compare across Arizona buildings, see best insulation for Arizona heat.
Yes. Spray foam is often the easier fit in a finished steel building, because it goes on from the inside without taking panels down. A blanket system is easier before the walls are closed in. We'll tell you which makes sense when we walk the building.
The plans, the building's address, the type of building and your schedule. Tell us whether the insulation will stay exposed or be covered by a ceiling or liner. We send back a written quote.
Yes. We insulate wood-framed and block-framed offices, shops and warehouses too. The roof or ceiling comes first, and we add walls where they're worth it.
Ask for a free site visit on our free estimate page or call us. We come out, measure and look at the roof and walls, then send the quote in writing.
Tell us about your metal building, shop, warehouse or office, and we'll come out and walk it. You get a written quote after the visit.
Licensed & insured · Free estimates